When installing the Grundfos pump equipment

1. All equipment is supplied to the assembly, shall be provided with adequate technical documentation (drawings, passports, books, boilers, etc.) and subjected to audit and reconcile with the technical documentation.
2. All the devices before installation on site are subject to autopsy, an internal inspection and thorough cleaning of contamination. Devices should be collected on the pads according to the specifications indicated in the drawing apparatus.
3. All mechanisms: mixers, Grundfos pumps, etc. - should be adjusted, cleaned and lubricated.
4. Equipment should be installed vertically plumb to me the level and securely in place.
5. Under the pumps and other machinery manufacturing bases should be in accordance with working drawings.
6. Manufacturing of frames under the pumps to make after receiving the equipment and matching mounting distances.
7. When installing the pumps, compressors and other machines guided by the manufacturer's instructions.
8. Apparatus and plumbing pipeline, connecting them to ground in accordance with "Rules of protection against static Tacoity and lightning in the secondary manifestations of the chemical industry"
9. Bottom devices, installed directly on the foundations should be painted with bitumen twice.
10. Filling machines packed after filling nozzle to produce vehicles with water.
11. Closing the device is made in the presence of shops and TCI.